Skip to content

One shared view of your production.

production.AI links the data of your production with its context: which machine, which order, which shift, which tool, which cause, and what it costs.

Only this context makes analyses traceable and actions justifiable. Improvement builds on it, with AI as support and people who decide.

Machine, order, operator, quality, tool and maintenance come together in one production context. From it, your team derives actions.

Four areas, one context

Machines & shop floor

What is running, what is down and why, straight from the machine and the operator.

  • Machine connectivity independent of the manufacturer, including mixed machine parks
  • Run times, downtime and OEE per machine, shift and order
  • Shop floor data collection: reports and piece counts at the workstation
  • Operators record causes directly at the machine
Press 3Hall 2 · Forming lineLive
Run time6.4h↑ 0.3 h vs yesterday
Good parts1,202pcs↑ 64 pcs
Scrap38pcs↑ 1.1 % rate
Downtime96min↓ 18 min
Shift timeline06:00 – 14:00
RunningStoppedFault
Ordersince 06:00
FA-20418 · Side panel leftTool WZ-17
Target1,800 pcsActual1,240 pcsLeft560 pcs
Shop floor entries5 stoppages
  • Changeover18 min07:10 · M. Kaya
  • Tool cleaning12 min08:30 · M. Kaya
  • Material shortage24 min09:42 · M. Kaya
  • Coil change28 min11:30 · M. Kaya
  • Ejector sensor14 min12:51 · S. Wolf
Avg. run time6.8h
Output5,360pcs
Scrap2.0%
Downtime4.7h
Presses comparedEarly shift · 480 min per press
Press 11,410 pcs · 1.8 % scrapPress 21,530 pcs · 1.2 % scrapPress 31,240 pcs · 3.1 % scrapPress 41,180 pcs · 2.4 % scrap
RunningStoppedFault
Most frequent reasonsall presses · early shift
Material shortage · 3× Changeover · 4× Coil change · 2× Ejector sensor · 2×

Processes & resources

Process, quality and tool data across the entire life cycle.

  • Process and quality data linked to order and shift
  • Tool management with tool history and tryout
  • Maintenance and servicing
  • Record media consumption and assign it to orders
Tool record WZ-17Progressive die · Side panel leftIn use · Press 3
Total strokes1.84m
Since maintenance17,240
Next maintenance2,760strokesapprox. 2 shifts
Downtime 12 mo.14h2 repairs
Historynewest first
  1. 29 OctFA-20418 on press 3Production1,240 strokes · scrap 3.1 % · running
  2. 14 OctFA-20377 on press 3Production7,400 strokes · scrap 1.9 %
  3. 8 OctCutting edge station 4 chippedRepairInsert replaced · 6 h downtime · T. Brandt
  4. 2 OctFA-20341 on press 1Production8,600 strokes · scrap 1.6 %
  5. 30 SeptScheduled maintenance after 20,000 strokesMaintenancePunches reground · 3.5 h · T. Brandt
  6. 17 SeptTryout after change to station 2Tryout40 parts · released by QA
Maintenance interval
86% of 20,000 strokes
Master data
Part
Side panel left
Stations
6
Location
Rack B-04
Presses
Press 1, Press 3
Since
03/2021
Runs5orders
Strokes34,640
Avg. scrap1.8%
Avg. changeover22min
Runs per orderlast 3 months
OrderStrokesScrap
FA-2041829 Oct1,2403.1 %
FA-2037714 Oct7,4001.9 %
FA-203412 Oct8,6001.6 %
FA-2029622 Sept8,1001.7 %
FA-202548 Sept9,3002 %

Business context

Orders, feedback and costs in the same picture.

  • Orders and feedback reconciled with the ERP
  • Product and project data
  • Economic evaluation of losses and actions
Order FA-20418Side panel left · 1,800 pcs · due Fri 31 OctERP reconciled
Progress69%1,240 of 1,800 pcs
Cost per pc2.84€Plan €2.61
Shift loss541€Downtime and scrap
Due date31 Octon schedule
Plan vs. actualEarly shift
MetricPlanActual
Good parts1,400 pcs1,202 pcs
Changeover time15 min18 min
Unplanned downtime–78 min
Scrap1.5 %3.1 %
Material1.9 t1.9 t
Feedback to ERP confirmed · 14:02 · 1,202 good, 38 scrap, 6.4 h
Loss by cause€541
  • Scrap€129
  • Coil change€120
  • Material shortage€103
  • Changeover€77
  • Sensor fault€60
  • Tool cleaning€52
Entries14630 days
With cause92%
Operators14
On FA-204187
Operator entriesfree text · linked
  • S. WolfToday 12:53“Ejector sensor dirty, cleaned, running again.”WZ-17Fault
  • M. KayaToday 11:58“Coil change delayed, no forklift available. New coil at the press only at 11:50.”Press 3FA-20418Coil change
  • M. KayaToday 09:44“Material not in place, requested supply from store 2.”Press 3Material shortage
  • T. Brandt8 Oct 14:20“Cutting edge st. 4 chipped. Twice already with coils from supplier B.”WZ-17RepairSupplier B
Frequent topics30 days
  • Forklift / supply9
  • Coil from supplier B6
  • Ejector sensor4
  • Setup trolley incomplete3

Improvement & AI

From insight to an action that is followed up. The AI supports, your team decides.

  • IDA, the issue and action management: owners, due dates, status
  • Shop floor chat: questions in natural language to your own production data
  • AI analytics: patterns across downtime, quality and tool data
Loss analysisAll presses · machines, shop floor data, tooling, quality, ERPAI analytics
Loss12,550€↓ €640 vs last month
Data sources6linked per event
Loss driversPareto · in €
Loss per causeCumulative · 4 causes = 70 %
Downtime9,040€
Scrap + tooling3,510€
Loss per weekin €
€3,480€2,910€3,320€2,840
DowntimeScrapTooling
Shop floor chat
When does material shortage occur at press 3?

17 of 23 cases in the last 4 weeks fell in the early shift between 9 and 11. In 14 of them the material came from store 2.

EvidenceDowntime recordsERP supply
Is the scrap at press 3 linked to WZ-17?

From around 15,000 strokes after maintenance, scrap with WZ-17 rises from 1.7 % to 3.1 %. The tool currently stands at 17,240 strokes.

EvidenceTool record WZ-17Quality data
What did material shortage cost this month?

Around €2,940 for 11.4 hours of downtime. 61 % of that falls on press 3.

EvidenceERP hourly ratesDowntime records
Ask, for example

One stoppage, start to finish

  1. Machines & shop floor

    Press 3 has been down since 14:12. The platform detects the stoppage automatically, before anyone reports it.

  2. Machines & shop floor

    The operator selects the cause at the terminal: material shortage.

  3. Processes & resources

    The stoppage is linked to order FA-20418 and tool WZ-17.

  4. Improvement & AI

    The shift supervisor creates an action in IDA, with an owner and a due date.

  5. Business context

    Downtime and loss of press 3 show whether the action is working.

Each station uses a different part of the platform. Together they turn a downtime figure into an improvement.

Frequently asked questions from IT and production

Machine controls and sensors via common industrial protocols, independent of the manufacturer and also in mixed machine parks. In addition, shop floor terminals, quality and tool systems as well as ERP systems via standard interfaces. We clarify together which protocols and systems are in use at your site.

Access is granted by role, from the operator at the workstation to the management. Each role sees what it needs for its decisions.

We need access to the relevant machines and a server in your OT network that runs the connection. Whether production.AI is then operated in the cloud or on your premises determines the further scope. We clarify that in the discovery call.

Both are possible: production.AI can be operated in the cloud or on-premise in your own infrastructure. Which model suits you depends on your IT and data retention requirements and on the use case. We define that together with you.

production.AI is certified to ISO/IEC 27001 for the development, operation and support of the software. Data is transmitted and stored encrypted. Whether it resides in the cloud or in your own infrastructure is a decision we take together with you, in line with your requirements and the use case.

Read the information security policy

You start with one line or one area. That keeps the effort manageable, and the roll-out follows once the first actions take effect.